IREN's revenue crossed over in one quarter: what the audited lines say about the miner-to-neocloud pivot
In the quarter ended June 30, 2026, IREN's AI Cloud revenue ($70.5M) passed its Bitcoin mining revenue ($66.7M) for the first time in an audited line. The next quarter, it was $200M against $28M - a 7-to-1 ratio that, in January 2025, the company had been reporting as $0.8M against $52M. The pivot is not a strategy slide; it is in the revenue table, the impairment column ($638.8M, mostly miners decommissioned while sites convert), and the pricing sheet ($40M per megawatt on a recent short-term deal). This is the arc assembled from IREN's own filings, 19 months end to end.
IREN's pivot is measurable in audited lines, not press language. January 2025: AI Cloud was $0.8M monthly against $52M of mining. Fiscal 2026: $128.8M AI (up ~8x) against $578.2M mining, with a $638.8M impairment the company ties "primarily" to decommissioning mining hardware as sites convert. The crossover quarter: Q4 FY26 — AI $70.5M vs mining $66.7M. One quarter later: $200M vs $28M. Backlog $20.3bn. The footnote matters: "$4bn contracted ARR" is GPU-price x 8,760-hour arithmetic, not GAAP — "recognized revenue may be materially lower." Still loss-making: $(263)M last quarter.
This company's filings are one query away — as are the filings behind any of the numbers below.
Where the arc starts: a miner that watched Stargate from outside
Start with the February 6, 2025 monthly update. IREN's numbers that month: $52.0M revenue, 29 EH/s, 510MW data-center capacity, 1,896 NVIDIA H100/H200 GPUs — AI Cloud Services contributing $0.8M, about 1.5% of revenue. The Stargate news cycle had just hit. The CEO's comment is worth reading word by word: "Recent announcements regarding Stargate highlight the strategic value of IREN's 2,310 MW grid-connected power portfolio, with an increase in observed demand for our cloud and colocation services since the start of this year."
IREN never claimed a Stargate seat in its filings. What it claimed was the mirror image: that OpenAI's headline deal told the market what IREN's power was worth. Thirteen months later it signed the $9.7bn Microsoft GPU-cloud contract — 20% prepaid — for the same Childress campus where it had been decommissioning miners to make room.
The crossover, in the company's own tables
- Q4 FY26 (ended June 30, 2026): AI Cloud $70.5M vs Bitcoin $66.7M. First audited quarter where compute-for-hire out-earns mining.
- Q1 FY27 (ended September 30, 2026): AI Cloud $200M ($135M services + $65M newly-booked lease revenue) vs Bitcoin $28M. Mining is now the rounding error; it fell 66% sequentially as capacity converted.
- The bill for converting: full-year FY26 net loss $(702.6)M, driven by $638.8M of asset impairment the company attributes primarily to decommissioning Bitcoin mining hardware as sites convert. That line is the price of speed: the machines come out whether or not they still make bitcoin profitable.
The mechanics of the AI line: Horizon 1 (50MW, liquid-cooled, GB300 NVL72) was delivered to Microsoft in August 2026 and went into service with NVIDIA Exemplar Cloud status; Horizons 2-4 at the same Childress campus run to a 200MW block. "Operating ARR doubled to a billion" is how the CEO framed the quarter — with the company's own footnote warning that ARR is priced-GPU arithmetic, not GAAP: recognized revenue may be materially lower.
What the pricing sheet says about leverage
Three numbers from last quarter say more than any argument. A 5-year contract signed after quarter-end at about $22M revenue per IT-megawatt, with the customer prepaying 90% of GPU capex. A short-term contract at $40M per MW. And IREN's own line: "Contracted H100 GPUs at double previous pricing." Contracted pricing rose 11-12% on new 3- and 5-year deals within the quarter. When a provider can re-sell its oldest GPUs (H100s, two generations behind) at double the prior rate, the shortage it exposes is not equipment — it is powered, cooled, buildable sites. IREN's disclosed moat is therefore boring and real: >5GW secured power across >30,000 acres, plus $3.6bn investment-grade financing at 6.0% specifically matching the Microsoft contract's GPU capex (96% funded together with prepayments).
The other half of "boring": the FY27 capex plan of $15bn is covered for $9bn by cash and committed financing plus prepayments; the remaining $6bn is, in the company's own words, "subject to market conditions." The conversion is ultimately scored there.
What these lines cannot tell you
- ARR is not revenue. The company says so itself: the $4bn contracted ARR is an operating metric — priced-GPU arithmetic — and "recognized revenue may be materially lower." The ARR date already slipped from year-end to January (possibly February) 2027 on a customer-requested design change and supplier timing.
- The pivot isn't profitable yet. Q1 FY27 net loss $(263)M; the AI segment's 86% gross margin is before depreciation and corporate costs. Mining's collapse to $28M per quarter also removes the cash engine the conversion was partly funded by.
- Concentration cuts both ways. Horizon deliveries to Microsoft are the credibility; "approximately two-thirds of backlog with investment-grade counterparties" is the company's own framing of the same fact. The new "leading frontier AI lab" is anonymized in filings — press names candidates, we don't launder them in.
- One company, not the cohort. Applied Digital and CoreWeave convert on different balance-sheet terms. This crossover is proof of feasibility, not an industry law.
Did IREN join the Stargate project?
When did IREN's AI revenue pass Bitcoin mining?
What did the conversion cost?
Is the $4bn ARR real money?
Who else is on the contract list?
- Financials: IREN FY26 results 8-K (filed 2026-08-27) and Q1 FY27 8-K (2026-11-05) read verbatim; segment lines as reported (Q1 FY27 splits AI Cloud Services $135M + AI Cloud Lease $65M). January-2025 baseline: 6-K monthly update (2025-02-06). Fiscal year runs July-June.
- Pricing points ($22M/MW five-year with 90% prepay; $40M/MW short-term; H100s at double) are post-quarter signings as described by the company on Nov 5; per-MW figures use the company's IT-load basis.
- Impairment attribution is quoted company language; we do not claim the miners were uneconomic to run.
- Microsoft contract terms ($9.7bn / 20% prepayment / GB300 / Horizon 1-4) come from the 2025-11-03 8-K, cross-referenced in our contract-matrix article (12 self-filed documents naming Microsoft, event forms, deduplicated).
- "Frontier AI lab" stays anonymized as filed. No investment advice; no view on share price.